7 May 2015

Electing quarry scalpings & sand

Today Jaimin borrowed Thomas & Bridget's trailer again and went to Craiglash Quarry to collect 1.5 tons of scalpings. These are sticky ungraded multi-sized (100mm to powder) off cuts from the quarry which make good sub base for tracks. Given the recent rain and delivery issues (trucks struggling with traction) we thought it a good plan to try and put some rock down.

Loading up

Weighing in
Although 1.5 tons looks like very little in the trailer, the car was feeling the weight. It took a while to empty out on to the track and only covered about 12m! But, hopefully a few more trips will keep building it up.

12m of scalpings = 1.5 tons!
After the scalpings were unloaded it was on to the levelling & sand. Some more raking, digging, spreading and confusion ensued. After some deliberation the decision was taken to get some sand in. If the floor is too low (which it is...) we'll just add cement, insulation and/ or screed when the time comes to build it up. No danger! A few barrows later and it was time to make for home, dropping off the trailer and going to the polling station!

Sand is starting to make its way in

Moooooooo!

Insulation delivery & Whacking sub base

Yesterday Jaimin started early and met the insulation delivery driver on site (who very nearly got stuck). After removing the 3 stuck sheep from the barn, they stacked the insulation. Supplies are coming in thick and fast...

Sarking boards
Sand pile 
Insulation
In the evening he collected the compactor plate or whacking plate and headed up to the plot. He did some more raking, levelling and then started up the whacker. This compacts the sub floor to make sure nothing will give way when load is applied. The vibration is pretty strong!

Whacking plate
The north west corner was still wet and sludgy from the rain, which left a gluey, batter like consistency in the earth. Hopefully it will dry out soon but it's in a protected part of the building with little wind or sun.


6 May 2015

Floor prep & getting stuck

After the wall head, Sunday required some significant clearing out. Jaimin managed to clear the West side out fairly quickly but the East side was done on the wettest most dull grey Scottish day ever. Thankfully Ali was on hand to help and suffer alongside in the wet.

Stuck.
During this episode, "somehow" they managed to get the Volvo stuck at the bottom of the hill. Long story short is that is stayed the night there and the next day Jaimin went back, used the dropped chimney blocks to make a "track" and then managed to get out. :-)

Almost free...
Following a conversation with the roofer, and a few others, mentioned that using a cement pump while the roof is off would be sensible. So we've decided to hold on the roofing, and go for that plan. Cue a lot a shopping and some more deliveries - sand, rebar, insulation, 1200ga DPM and tape...
One of the consequences is that we have to get the level of the shower drain sorted, so very depressingly Jaimin has had to dig out the gravel from the French Drain and make a hole through the soil to the bathroom.


Plan is to whack and lay sand this week, lay the DPM and insulation (and rebar) this weekend, and get the concrete in... The weather could be a big issue though while the DPM is installed. And it will probably be delayed... 

Wall plate levelling

Last weekend the roofer finished levelling the wall head and installing a threesome of concrete lintels above the bathroom door. It involved a very cool Stihl stone saw. During the process, we decided the lintel above the north facing window was too rotten so I became a joiner, and had to improvise with making a lintel. Because it's C16 I've decided despite it doing the job I'm going to replace it, and the other 3 lintels on the main room, with C24. They take minutes to make and are treated.

New lintels above bathroom door

New, but useless, C16 lintel to be replaced

The observant amongst you may have noticed we have dropped the central chimney. Gone! 


There was more tidying up, below, and there are now some slates to grade...





1 May 2015

Lifting the lid

After an unexpectedly extended Easter break helping Bumpy build his shed, the roofer has been up to tear off the roof and prepare for the delivery of new trusses to erect and re-slate.




Bumpy's shed:


12 Apr 2015

Rabbit protection

The mission today was to patch up the holes in the internal wall and repair the sleeper wall that had been penetrated by vermin (mainly rabbits). The Big Man (James) kindly lent a hand which made things tick along nicely. His uncle is a brickie so while at B&Q gathering supplies he made a quick call to establish the mix ratios required :-)






We started using a good 1:5 mix with a drop of plasticiser, mixing in the wheel barrow (not the cement mixer...) and managed some patching.Tip for all (including those builders on YouTube): use a garden hoe to mix the mortar-mix, it's a revelation. Despite an overly generous use of plasticiser, our mortar mix skills improved well as the day proceeded.

We revealed the extent of the "vent holes" that had been built in to the sleeper wall (why were the facing down slope in to the house?) we decided to mix some gravel in to the mortar to create an aggregate mix, which worked much faster.



Once the internals were done we did some very rough "re-pointing" on the gable walls, with some more tidying up on the external faces of the old vents.


Once James left, Jaimin did some laser levelling of the drain pipes to try and get a feel for what the level of the main soil pipe will have to be. Some working out leads us to the rather depressing statistic that this will be about 380mm lower than the existing pipe... some digging awaits.

11 Apr 2015

Bricking it


The wall that broke when ripping out the bathroom door frame was patched up (badly) and gave Jaimin a new respect for brickies. The cement mixer with "next day delivery" that was ordered on Wednesday failed to materialise so the wheelbarrow and spade were employed. Mixing mortar for the first time ever was not very successful but after a morning of effort the walls seems to be repaired.
Jaimin says that using his hands was apparently a lot easier than using a trowel.

Bricked up


In the afternoon Nick arrived and after trying (with moderate success) to work out the existing fall to the septic tank inlet (it's ~1.5m from the kitchen drain) Nick & Jaimin set about digging a trench above the clay pipe. Unfortunately installing the shower at the "right height" will require a new drain pipe... But this is probably the right thing to do in the log term and should also give us some options to separate rain water from grey water. Blisters abound...