Pages

12 May 2017

Internal joinery

This post will hopefully be edited and better explained soon but to keep you updated, there have been developments over the past few weeks with:

Kiran visiting and helping by sanding the bedroom floor. Osmo was then applied to protect it.


Eila started sanding the kids room floor too.

The kids room started to take shape with shelves now done and the beds put together.





We bought some fantastic milled oak and lyme boards from a a tree surgeon friend. These were heavily sanded, then cut to size to make shelves. Oak in the kitchen and lyme in the lounge.

Preparing the oak



Preparing the lyme





Wardrobe doors have also been made and are being painted


The garden is slowly starting to come together. Our first planting box:


And a front path:




The kids need storage for clothes so Jaimin made some boxes on "ball transfer units" or rollers:


 

No comments:

Post a Comment