Since mid week the theme has remained the same, framing. But a few things are worth mentioning. The large fireplace has been propped up with a post to hold up any dodgy breeze blocks, and 100mm PIR board has been installed to keep the draft and cold air out, with foam to fill the gaps.
First off, the fiddly "alcove corners" have been a real pain to assemble and size, but they are now done apart from one teeny bit in the SE corner which should only need 1 upright. We've also sussed the corner detail which, as easy as it is and easy as it looks, was one of those concepts that took a while; it just did.
|
Corner detail |
|
North east corner of the kitchen. Built and ready to fit (with help). |
There's been a bit more Tyveking,so the east frame is covered.
|
East wall Tyvek'd |
The north frame wall is done and fixed to the joists (ready to anchor). The meter tails (mains electrical wires) are also in place and ready to hook up to the consumer unit.
|
Wires peeping through... |
The Tyvek has also been cut out of the window openings, which is a minor change but adds to the feel.