Pages

27 May 2016

Chimney adaptor, first copper, sink pipes.

Yesterday Jaimin managed to spend some time with Ollie in the evening, and designed an outline plan for the heat leak radiator copper pipe runs. Following some Youtube tutorship, the first copper connections were made, and then the pipe was passed behind the stud and clipped in to place with a constant rise, as it will be a gravity driven circuit.



The local blacksmith was called upon to build a rough and ready flue adapter to go from the 6" stainless steel flexi flue to the main chimney, which will enable the bypassing of the void space above the stove. This will hopefully improve the draw and also eliminate the need to heat a void of cold air. This needs to be fitted before the stove goes in.



Once Ollie left, Jaimin did some easy Hep2O connections to bring the kitchen sink and bathroom basin pipe out through the walls.



No comments:

Post a Comment