Jaimin has been setting out and soldering copper connections for the heat leak (bathroom) radiator. Having never soldered let alone solder water pipes, this involved a YouTube training course which seems to have paid off.
The cold run is complete, and most of the hot run is done, leaving a non return valve and then the actual radiator to be done. The hot connection to the wood burner also remains, as well as the pipes to the thermal store.
|
Cold return from the bathroom back to the stove |
|
Cold return at the stove; hot flow not complete. |
On Sunday, Simon came to help, and cut the 25mm PIR to size for the west gable wall. They then installed some more ceiling 20mm boards.
Tonight Jaimin made up some noggins to frame the east gable and insulated it as well.